CATAMARAN BUILD – We’re Preparing For Something BIG!! (MJ Sailing – Ep 186)

We have a treat for you with our newest episode – and the great news that our Methacrylate has arrived! Now this means we can permanently bond our hull pieces together!

Before we get ourselves to the point of no return though, we need to figure out a way to suspend the panels to clean them up as well as get the bonding agent on before they’re placed onto the hull. Starting small, we decide to work the forward inner hull pieces first since they only weight about 150 pounds (75 kg) each.

So sit back and join us for this episode where Matt once again ‘MacGyver’s’ his way through a situation with what we have on hand in the tent.

We hope you enjoy!

Much love from Annapolis!
Jessica, Matt & Georgie

Tags: No tags

Add a Comment

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.